2023年全國(guó)碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩19頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、1Railway Condition Monitoring,2006. The Institution of Engineering and Technology International Conference on 29-30 Nov.2006 Page(s):63-66 IEE CNFMETHODS AND TOOLS FOR PREDICTING WORKING MODES OF RAILROAD POWER-

2、SUPPLY SYSTEMSZaytseva, L.A.; Zaytsev, V.V.Rostov State University of Transport Communications, Lenin Street, 44/6, Apt. 23, 344038 Rostov-on-Don, Russia tvadim@cs.vu.nl, fax: +31(20)5987653Keywords: power supply, elect

3、rification, breakdown mode, modelling.AbstractThis research is dedicated to design and implementation of a computer application for predicting the functioning of a railway power supply system (both on developing stage an

4、d in operational state). The process of creating a model for simulation of train movements is described in detail. Two working modes are considered in required hardware reliability estimation: a normal mode (standard con

5、ditions) and a breakdown mode (when one of the substations is down). Model analysis and implementation of the results obtained show their trustworthiness. While exploring model behaviour, we could determine minimum time

6、interval between trains, estimate maximum possible current, voltage losses, as well as other parameters.1 IntroductionDuring the last decade railway electrification was a hot topic in Russia. A lot of attention has been

7、 paid to economic efficiency of the solutions proposed for newly electrified zones. Total cost of ownership should be as 3always has higher currents and voltage losses. Therefore, it may pose certain limitations on train

8、s' admission.For a double track railway section and two-side feed it is common to make an additional connection of traction networks of two tracks by means of a so-called sectioning post (Figure 1). The sectioning po

9、st allows to make currents in these two traction networks equal. This decreases voltage and power losses; thus, the sectioning post should normally be operational.Figure 1: Primary feeding scheme for a double track secti

10、on.Figure 2: Separate feeding of two tracks.When a sectioning post goes down (or is switched off), the scheme looks more like Figure 2 and is called the separate feeding scheme.We have seen two possible feeding schemes i

11、n normal mode. By “normal mode“ we mean any situation where all railway stations remain operational (as opposed to “breakdown mode“, when one of them is down).2 ModellingThe problem solution consists of following issues

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論