2023年全國(guó)碩士研究生考試考研英語(yǔ)一試題真題(含答案詳解+作文范文)_第1頁(yè)
已閱讀1頁(yè),還剩5頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Designation:D2325–68(Reapproved2000)StardTestMethodfCapillaryMoistureRelationshipsfCoarseMediumTexturedSoilsbyPousPlateApparatus1ThisstardisissuedunderthefixeddesignationD2325thenumberimmediatelyfollowingthedesignationin

2、dicatestheyearofiginaladoptioninthecaseofrevisiontheyearoflastrevision.Anumberinparenthesesindicatestheyearoflastreapproval.Asuperepsilon(e)indicatesaneditialchangesincethelastrevisionreapproval.1.Scope1.1Thistestmethodc

3、oversthedeterminationofcapillarymoisturerelationshipsfcoarsemediumtexturedsoilsasindicatedbythesoilmoisturetensionrelationsftensionsbetween10101kPa(0.11atm).Underequilibriumconditionsmoisturetensionisdefinedastheequivale

4、ntnegativegagepressuresuctioncrespondingtoasoilmoisturecontent.Thistestmethoddeterminestheequilibriummoisturecontentretainedinasoilsubjectedtoagivensoilwatertension.Thistestmethodisnotsuitablefveryfinetexturedsoils.NOTE1

5、—FdeterminationofcapillarymoisturerelationshipsffinetexturedsoilsrefertoTestMethodD3152.1.2Thisstarddoesnotpurpttoaddressallofthesafetyproblemsifanyassociatedwithitsuse.Itistheresponsibilityoftheuserofthisstardtoestablis

6、happropriatesafetyhealthpracticesdeterminetheapplicabilityofregulatylimitationspritouse.2.ReferencedDocuments2.1ASTMStards:D421PracticefDryPreparationofSoilSamplesfParticleSizeAnalysisDeterminationofSoilConstants2D698Tes

7、tMethodfLabatyCompactionacteristicsofSoilusingStardEfft(12400ft–lbfft3(600kNmm3))D3152TestMethodfCapillaryMoistureRelationshipsfFineTexturedSoilsbyPressureMembraneApparatus23.SummaryofTestMethod3.1Saturatedsoilsamplesare

8、placedincontactwithasaturatedpousplateinstalledwithinapressurechamber.Thebottomofeachplateiscoveredbyarubbermembraneotherwisesealedtobeairtight.Thebottomofeachplateismaintainedatatmosphericpressurebymeansofasmalldraintub

9、eopeningthroughthesideofthepressurechamber.Adesiredairpressureadmittedtothepressurechamberconsequentlytothetopofthepousplatecreatesapressureacrossthepousplate.Thesaturatedsoilsamplesontheplatesestablishequilibriumwiththe

10、waterintheplate.Thewaterheldatatensionlessthanthepressureacrossthepousplatewillthenmoveoutofthesoilthroughtheplateoutthroughthedraintube.Whenwaterhasceasedtoflowfromthesamplepousplate(indicatingequilibriumfthatparticular

11、tension)themoisturecontentofeachsampleisdetermined.Aseriesofthesetestsatvarioustensionsisrequiredtoprepareacompletecurveofthecapillarymoisturerelationshipfanyparticularsoil.4.Apparatus4.1Anassemblyoftheapparatusisshownin

12、Fig.1.4.1.1PousPlateApparatusconsistingofthefollowing:4.1.1.1PressureContainer(suchasapressurecooker)ofapproximately15L(16qt)capacity.4.1.1.2PousCeramicPlates1to4(seeFig.2)approximately280mm(111?4in.)indiameter6mm(1?4in.

13、)inthicknesswithanairentryvalueof203kPa(2atm).4.1.1.3BrassSpout—Thebrassspout(oneperpousplate)shallconsistofabrasstubeassociatedwashersgasketsbrassnuts.Itshallprovideanairtightjointwhenedthroughthepousplate38mm(1.5in.)fr

14、omtheedgeoftheplate.Thelengthoftheunthreadedptionofthebrasstubeshallbe9.5mm(3?8in.)thelengthofthethreadedptionshallbe15.8mm(5?8in.)theinsidediameterofthetubeshallbe1.7mm(1?16in.)theoutsidediameteroftheupperunthreadedptio

15、nshallbe4mm(5?32in.)theoutsidediameterofthelowerthreadedptionshallbe4.8mm(3?16in.).Thetapsizeftheholethroughthepousplateshallbe5.5mm(7?32in.).4.1.1.4Disksof10meshBrassScreenfrom1to4ofslightlysmallerdiameterthanbottomofpo

16、usceramicplates.4.1.1.5RubberMembrane—Themembraneshallconsistofsheetneoprene0.79mm(1?32in.)inthicknesswithahardnessof35bytheSheDurometer.Placeadiskofbrassscreenoverthebottomofeachpousceramicplatetoprovidespaceftheflowofw

17、aterbetweenthemembranetheceramicplate(seeFig.2).Thenplacetherubbermembranesnuglyoverthebrassscreenglueitsecurelytotheouteredgeoftheceramicplatewraptheedgetightlywithwire(seeFig.2).4.1.1.6Tubing—Aflexibletubingtube3mm(1?8

18、in.)in1ThistestmethodisunderthejurisdictionofASTMCommitteeD18onSoilRockisthedirectresponsibilityofSubcommitteeD18.04onHydrologicPropertiesofSoilsRocks.CurrenteditionapprovedSept.131968.iginallyissuedasD2325–64T.Lastprevi

19、ouseditionD2325–64T.2AnnualBookofASTMStardsVol04.08.1Copyright?ASTM100BarrHarbDriveWestConshohockenPA194282959UnitedStates.preventabsptionofmoisturefromtheatmospherefollowingdryingbefefinalweighing.Onecontainerisneededfe

20、achmoisturecontentdetermination.Containersshouldbe6090cm3(23oz)capacity.Thecontainersarenumberedinpairstocoincidewiththeretainerrings.4.1.11SaturationTray—Awaterprooftrayabout30mm(1.2in.)indepthlargeenoughtoholdatleast4p

21、ousplateswhilesamplesarebeingsaturatedthereon.4.1.12Balance—Abalancewithacapacityofatleast200gsensitiveto0.01g.4.1.13Desiccat—Adesiccatofsuitablesizetoholdsamplesfcoolingafterremovalfromtheoven.4.1.14Oven—Athermostatical

22、lycontrolleddryingovencapableofmaintainingtemperaturesat11065C(23069F).4.1.15Trimmers—Wiresawbevelledstraightedgespatulaothersmalltoolsftrimmingthetestspecimen.5.Samples5.1Maketestsinduplicateonspecimenscutfromundisturbe

23、dremoldedsamplesonspecimenspackedfromloosedisturbedsamples.Placeduplicatesinpairedretainerringsdiametricallyoppositeeachotheronthepressureplate.6.PreparationofTestSpecimensfromDisturbedSamples6.1Takeasampleweighingapprox

24、imately25gfromthethoughlymixedptionoftheairdriedsoilpassingthe2.00mm(No.10)sievewhichhasbeenobtainedinaccdancewithPracticeD421.6.2Poureachsampleintoaretainerringpackleveltofilltheringbypressingthetopsurfacewiththetestspe

25、cimenpackerdiskusinganappliedfceof9000g.Recdonthereptfmthesampletypedisturbedthenumbersofthepairedsampleretainerringscontainingtheduplicatesamples.7.PreparationofTestSpecimensfromUndisturbedSamples7.1Cutablockofthemateri

26、alfromwhichthetestspecimenistobepreparedwithtwoplanefaces.Determinerecdthenaturalmoisturecontentdryunitweightofthesampleblock.Alsorecdthedirection(perpendiculartransverse)ofthesamplinginrelationtothestructuraldepositiona

27、llayers.7.2Placethetestspecimencutterwiththecuttingedgedownwardontopofoneoftheplanefacesfcethecutterdownlightlygraduallyasexcessmaterialistrimmedfromtheoutsideusingtheminimumpressurerequiredonthecutter.Thetrimmingmotions

28、shallbefromthecutteroutwarddownwardleavingacolumnofsoilslightlylargerthantheoutsidediameterofthecuttingedge.Whenthecutterismethanhalffullofsoilremovetheexcessatthebottomwiththewiresawinvertthecutteruseastraightedgetomake

29、thesoilflush.Invertthecutteragainplaceitonthesmoothfaceofthemetalblankcarefullyfceitdownwarduntiltheblankisflush.Removetheexcesssoilatthetopwiththewiresawtruetheendwiththestraightedgeremovetheblankbymeansofthedetachableh

30、le.7.3Placethespecimencutterwiththespecimendownwardoveraretainerringusethemetalblanktogentlythetestspecimenintothering.Recdonthereptthesampletypeundisturbedthenumbersofthepairedsampleretainerringscontainingtheduplicatesa

31、mples.7.4Maintainthesamplesinclosedcontainersuntiltimeftesting.8.PreparationofTestSpecimensfromCompactedSamples8.1CompactthesampletoadensitymoisturecontentdesiredfanticipatedserviceconditionsinaccdancewithTestMethodsD698

32、.8.2Afterthecompactedsamplehasbeenejectedfromthecompactionmoldcutthetestspecimenbytheprocessusedfundisturbedsamplesasdescribedin7.17.4.Recdonthereptfmthesampletypecompactedthenumbersofthepairedsampleretainerringscontaini

33、ngtheduplicatesamples.9.SaturatingTestingofPousPlates9.1Installbystackingwithplasticplugsfspacersasmanypousplatesinthepressurecontainerasaretobeusedinthetest.Fillthecontainerwithwaterplacethelidonthecontainerlockitinthec

34、losedposition.9.2ClosevalvesCEopenvalvesABsetthepressureat101kPa776mmHg(1atm15psi)byadjustingthecontrolvalveonthepressureregulatnotingthepressureonthemercurymanometer.OpenvalveConthewatertrapcylinder.Themeasuredrateofwat

35、eroutflowfromthepousplatesshouldbeatleast10mLminfsatisfactyoperationoftheplates.9.3Checktheplatesfairentryvalueasfollows:releasetheairpressurebyclosingvalveCbyopeningvalveDonthelidemptytheexcesswaterfromthepressurecontai

36、nerplates.Closelockthelidofthecontainerapplythedesiredpressure.Afterapproximately10minatthispressuretheoutflowofwaterfromtheplateoutletsshouldceasethereshouldbenobubblingofairfromtheseoutlets.Thiswillindicatethattheentry

37、valuesftheplatesareabovethevalueoftheappliedpressure.9.4Iftroubleisencounteredinairpressurecontrolsubmergethepressurecontainerinwaterwiththepressurestillontocheckfleaksinthelidgasketcontainerconnections.9.5Exercisecareth

38、atthepressureisreleasedbymeansofvalveDbefethelidisopenedinjurymayoccurtotheoperatdamagetothecontainer.10.Procedure10.1Placetherequirednumberofsaturatedpousplatesinthesaturationtrayonepousplatefapproximately12sampleretain

39、errings.PlacetheretainerringscontainingduplicatesamplespreparedasdescribedunderSections678onapousplatelocatingduplicatesamplesdiametricallyoppositeeachother.10.2Placeacontrolsampleretainerringinthecenterofthepousplate.In

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論