2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩51頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the

2、following conditions, procuratorial Agency to submit application through compliance reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarat

3、ions by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements; (3) the similar project tendering agency agent number and

4、provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has

5、similar projects the number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the

6、 application. 8.2.1 tender agent institutions similar project tender performance requirements (16 points) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar

7、project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 million Yuan have 2 points, water project cu

8、mulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculat

9、ion rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of s

10、cores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performance (10 points) Project Manager agent performance scores including agents of the bidding agencies of

11、 similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated winning amount ca

12、lculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for

13、 the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents

14、similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher people's Government or the development and Reform Commission published the winning bidder on the designated me

15、dia publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent ...Pig

16、 is not a pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integ

17、ration, to quality security for premise, regulation based farming, and management cost and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain

18、of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and consumption country, 2008 46.15 million tons of po

19、rk, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industry's annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. S

20、ichuan province in 2008 produced 6.52 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional plannin

21、g (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig industry mainly include the European Union, the United States, and Canada, and Brazil and other absolut

22、e scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from China's meat consumption habits and economic analysis of the development situation, the emergence of new tre

23、nds in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustmen

24、t gathered pace, two or three industries to the Central and Western bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute co

25、nsumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements. Pollution-free pork safety and health has shown a very good market prospe

26、cts. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and othe

27、r marketing methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important “River pig“ resource market, the city's commercial rate reaches above 60% of live pigs, pork

28、 and raw materials primary processing products in the domestic and international reputation is high. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate th

29、e development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, about 6 million tons of pork trade. A larg

30、e net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 milli

31、on tonnes were imported. It is predicted that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superio

32、rity industry belt construction, animal disease ...4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency include

33、d in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of

34、 the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application

35、should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agent'

36、;s service charges (meter prices [2002]1980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agent's service charges and, in c

37、onjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated.

38、Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the

39、end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agent's service charge control the upper and

40、 lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agent's service charges (meter prices [2002]1980) of tendering agent's service fees under 1

41、00%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agent's service charges (meter prices [2002]1980) of tendering agent's service fees unde

42、r 80%. Tendering agent's service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with

43、 tender bid amount as a base for a separate computation of tendering agent's service fees. Tendering agent's service fee payment in accordance with the General Office of the State development and Reform Commissio

44、n on tendering agent's service charge of notification on the relevant issues (the change price [2003]857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on

45、 the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Appl

46、ication of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file y

47、ou selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter applic

48、ation format notes: bidding agent ...施工組織設(shè)計(jì)目錄1 、編制說明 、編制說明...................................................................................................................................................31.1 承包范圍及內(nèi)容...

49、.................................................................................................................................31.2 目前狀況..................................................................................

50、..............................................................31.3 編制原則................................................................................................................................................31.4

51、編制依據(jù)................................................................................................................................................32 、工程概況 、工程概況..........................................................

52、.........................................................................................42.1 工程概況..........................................................................................................................

53、......................42.2 建筑設(shè)計(jì)................................................................................................................................................62.3 結(jié)構(gòu)設(shè)計(jì)....................................

54、............................................................................................................62.4 工程工期及質(zhì)量目標(biāo)一覽表...............................................................................................

55、.................63 質(zhì)量目標(biāo)及施工部署 質(zhì)量目標(biāo)及施工部署.................................................................................................................................73.1 質(zhì)量目標(biāo)..........................................

56、......................................................................................................73.2 施工項(xiàng)目管理和組織機(jī)構(gòu)......................................................................................................

57、..............73.3 項(xiàng)目經(jīng)理部各人員的主要職能............................................................................................................83.4 工程施工總體設(shè)想...................................................................

58、...........................................................103.5 資源配置..............................................................................................................................................104 、施工準(zhǔn)備

59、工作 、施工準(zhǔn)備工作.........................................................................................................................................114.1 技術(shù)準(zhǔn)備...............................................................

60、...............................................................................114.2 現(xiàn)場準(zhǔn)備...................................................................................................................................

61、...........115、施工進(jìn)度計(jì)劃 、施工進(jìn)度計(jì)劃...........................................................................................................................................135.1 總施工進(jìn)度計(jì)劃安排.....................................

62、.....................................................................................135.2 工期保證措施...........................................................................................................................

63、...........135.3 施工進(jìn)度計(jì)劃......................................................................................................................................145.4 勞動(dòng)力配備....................................................

64、......................................................................................156 土建工程主要施工方法和技術(shù)措施 土建工程主要施工方法和技術(shù)措施..................................................................................................

65、.....156.1 施工順序..............................................................................................................................................156.2 工程測量.....................................................

66、.........................................................................................176.3 土方施工.........................................................................................................................

67、.....................176.4 模板工程..............................................................................................................................................186.5 鋼筋工程.....................................

68、.........................................................................................................216.6 混凝土工程........................................................................................................

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論