版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、L’argent est le nerf de la guerre,Filomeno Martina,Scope,To compare the cost of a part made by WAAM vs traditional machined from solidTo assess the sensitivity of cost to changes in key cost drivers / process parameters
2、:Deposition rateBuy to fly ratioMaterial costMachine costCapacity utilisationMaterial removal rate,Machining from solid,Cost model terms:Mass of initial forging or billet ? cost of initial forgingBuy to fly ratio
3、 ? material to be removedMaterial removal rate ? machining time,WAAM,Cost model terms:Mass of substrate ? cost of substrateBuy to fly ratio ? material to be deposited, and to be removedDeposition rate + Starts&St
4、ops ? deposition timeMaterial removal rate ? machining time,Assumptions,General:No tooling / setup consideredNo post processing, non-destr. testing, on-line monit.1 operator for 1 machineMachining:One type of opera
5、tionIf WAAM machine cost > £250k ? Hourly rate mach = hourly rate WAAMWAAM:Starts&Stops: 1.1; if If WAAM machine cost > £250k ? SS = 1.5 to include rollingPlate £/kg = Billet £/kgOnly 1
6、 type of machining operation,Specific costs / performances,Unless specified differently:Cost of machine: £180kDepreciation: 5 yearsUtilisation: 80% Labour cost: £45/h ? WAAM hourly rate = £82/hCost of
7、 wire: £130/kgCost of forging: £60/kgDeposition rate: 1 kg/hMaterial removal rate: 8 kg/h (accounts for complexity)Machining hourly rate: £60/hCost of inspection: £1000To transfer to other mate
8、rials, change:Deposition rate, cost of raw materials, material removal rate,Results,Part costf(BTF, mass),Part costf(BTF, mass),Part costf(BTF, mass),Part costf(BTF, mass),Part costf(BTF, mass),Specific cost of dep
9、ositionf(deposition rate, BTF),Specific cost of depositionf(deposition rate, machine cost),Depreciation: 5 yearsBTF: 1.5,Specific cost of depositionf(deposition rate, utilisation),Depreciation: 5 yearsBTF: 1.5,30 kg
10、 part costf(material removal rate, BTF),Specific cost of depositionf(wire cost, BTF),Specific cost of depositionf(wire cost, machine cost),BTF: 1.5,Specific cost of deposition(WAAM vs high DR wire process),WAAM:HR:
11、£82/hDR: 1 kg/hProcess 1:HR: £360/hDR: 7 kg/hProcess 2:HR: £170/hDR: 7 kg/hTypical BTF of High dep. Rate is 10,Specific cost of deposition(WAAM vs high DR wire process),WAAM:HR: £82/hDR: 1
12、 kg/hProcess 1:HR: £360/hDR: 7 kg/hProcess 2:HR: £170/hDR: 7 kg/hTypical BTF of High dep. Rate is 10,Specific cost of deposition(WAAM vs high DR wire process),WAAM:HR: £82/hDR: 1 kg/hProcess 1:
13、HR: £360/hDR: 7 kg/hProcess 2:HR: £170/hDR: 7 kg/hTypical BTF of High dep. Rate is 10This makes them break even for very high BTF (machined from solid),Specific cost of deposition(WAAM vs high DR wire
14、process),WAAM:HR: £82/hDR: 1 kg/hProcess 1:HR: £360/hDR: 7 kg/hProcess 2:HR: £170/hDR: 7 kg/hTypical BTF of High dep. Rate is 10This makes them break even for very high BTF (machined from solid)
15、WAAM’s BTF is <2,Specific cost of deposition(WAAM vs high DR wire process),WAAM:HR: £82/hDR: 1 kg/hProcess 1:HR: £360/hDR: 7 kg/hProcess 2:HR: £170/hDR: 7 kg/hTypical BTF of High dep. Rate i
16、s 10This makes them break even for very high BTF (machined from solid)WAAM’s BTF is <2Lots of room to be cheaper than machining,The problem of powder-bed processes,Machine cost: £500kDR: 0.1 kg/h100% powder
17、utilisation50% beam-on timeNo post-proc.,CASE STUDIES,Case studies,BAE Systems spar,Case studies,Bombardier rib,Case studies,Bombardier rib (steel),Case studies,A pylon mount,Case studies,15 kg aluminium wing rib (DR =
18、 1kg/h),Option 1:,Option 2:,CAD:,Case studies,Titanium wing frame,Example part 1,Non-recurring cost of tooling and programming: £1500,Example part 2,Non-recurring cost of tooling and programming: £1500,Conclusi
19、ons,A cost model to compare WAAM vs Machining was definedSensitivity analyses were carried out and it was demonstrated that:Increasing the deposition rate above 1 kg/h has no economic benefit (for a robot-based cell)H
20、igher capital cost ? higher hourly rates; increasing deposition rate ? reduce specific costThe material removal rate does not really matterGiven the current conditions, WAAM always cheaper than machiningIncreasing dep
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- the nature of cost
- cost drivers in transport and logistics
- shanghai telecom cuts the broadband cost
- cost engineering in chinese construction sector
- construction project cost escalation factors
- chapter 8 applicationthe cost of taxation
- 西工大spm題庫(kù)cost
- cost_down會(huì)議的運(yùn)作
- a low-cost, smart capacitive position sensor
- Cost Engineering in Chinese Construction Sector.pdf
- Cost Engineering in Chinese Construction Sector.pdf
- the cost and value of early foreign language instruction in america
- current developments in cost accounting and the dynamics of economic calculation
- Cost Engineering in Chinese Construction Sector.pdf
- 財(cái)務(wù)和資產(chǎn)管理cost_distribution
- research into cost control strategy in engineering construction project
- research on fine management of construction cost based on bim
- design and fabrication of low cost filament winding machine
- cost accounting-a managerial emphasis【外文翻譯】
- strategic cost fundamentals - for designers, engineers, technologists, estimator
評(píng)論
0/150
提交評(píng)論