2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩37頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、華北理工大學(xué)輕工學(xué)院Qing Gong College North China University of Science and Technology供配電技術(shù)課程設(shè)計(jì)報(bào)告設(shè)計(jì)(論文)題目:某電纜廠供電系統(tǒng)設(shè)計(jì) 設(shè)計(jì)(論文)題目:某電纜廠供電系統(tǒng)設(shè)計(jì)學(xué)生姓名:李大偉 學(xué)生姓名:李大偉 郭根劼 郭根劼學(xué) 號:201224390522201224390536專業(yè)班級: 專業(yè)班級:12 級電氣 級電氣 5 班學(xué) 部:信

2、息科學(xué)與技術(shù) 部:信息科學(xué)與技術(shù)指導(dǎo)教師: 指導(dǎo)教師:馬亮2015 年 07 月 01 日Abstract AbstractWith constant development of science and technology and the progressing in an all-round way of the society, the living standards of the people are improving c

3、onstantly, the electric energy has already got deeply to our daily life and work, the study on extremely relevant problems of development of power industry emerges in an endless stream . It is on the basis of

4、 the current situation that the power industry of our country develops at full speed at present to originally design, combine the actual demand for development of new-type factory, advocate the policy of “ safe , high-ef

5、ficient , energy-conservation “, collect the switchyard , distribution , illumination , automatically control and regulate , the building defend thunder , protection , computer equipment control and offer the po

6、wer consuming system in the integrative modern chemical plant. Originally design in case of fully investigating the factory accords with equipment, it needs coefficient law to calculate the whole factory to loa

7、d electrically to adopt, sign the agreement with electricity industry department in view of the above, confirm the grade of supplying power. Carry on having according to actual demand of factory work compensa

8、te , confirm apparent to calculate load systematic, electric load different to divide different load classification into according to job requirements their the whole factory, develop and is it require a

9、ccording to factory , choose two platform factory use the main voltage transformer to plan, both as reserve way and meet, the dependability of guaranteeing to supply power. Draw the main wiring diagram of syste

10、m, the factory electric equipment of optimum seeking, and the stability demand carry on check-up according to generating heat, confirm finally that defends thunder protection and earth measure, guarantee to improve the

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論