版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、0浙江省工程建設(shè)標(biāo)準(zhǔn)建設(shè)工程竣工規(guī)劃核實(shí)測(cè)量技術(shù)規(guī)程Technical specification for finished construction surveyof planning to verifyDB**/****—200X(報(bào)批稿)××××-××-××發(fā)布 ××××-×
2、×-××實(shí)施浙江省住房和城鄉(xiāng)建設(shè)廳發(fā)布0Contents1 General Principles..................................................................................................12 Terminologies ........................................
3、.................................................................23 Basic Regulation .....................................................................................................4 4 Control Survey................
4、........................................................................................54.1 Horizontal Control Survey .................................................................................5 4.2 Vertical Cont
5、rol Survey......................................................................................75 Constructions(or Structures) Engineering Final Construction Survey ............85.1 General Regulation ................
6、.............................................................................85.2 Horizontal Position Survey.................................................................................9 5.3 Height and Floor Height
7、Survey......................................................................105.4 Final Construction Topographic Map Survey................................................125.5 Area Survey and Calculation ..............
8、.............................................................135.6 Outcome Submission.........................................................................................156 Road Engineering Final Construction Surv
9、ey...................................................16 6.1 General Regulation ...........................................................................................166.2 Zonal Topographic Map Survey..............
10、........................................................166.3 Vertical and Cross Section Survey ..................................................................176.4 Outcome Submission................................
11、.........................................................187 Underground Pipeline Engineering Final Construction Survey......................19 7.1 General Regulation ...................................................
12、........................................197.2 Horizontal Position Survey...............................................................................207.3 Height Survey ...............................................
13、.....................................................217.4 Underground Pipeline Final Construction Map ............................................227.5 Outcome Submission...............................................
14、..........................................228 Greenbelt Engineering Final Construction Survey..................................238.1 General Regulation ...............................................................
15、............................23 8.2 Greenbelt Final Construction Topographic Map Survey ............................23 8.3 Greenbelt Area Calculation......................................................................
16、........248.4 Outcome Submission ........................................................................................25Appendix A Relationship Map of Plane Position of Constructions (or Structures)...............
17、....................................................................................................26 Appendix B Outline Map of Height Survey..........................................................27Appendix C Outli
18、ne Map of Floor Height Survey ...............................................28 Appendix D Outline Map of Outside Profile Survey and Area Calculation ........29Appendix E Collective Table of Actual Survey Construction A
19、rea and Main Techno-economic Indicator.......................................................................................30 Appendix F Record Sheet of Pipeline Final Construction Suevey......................31Appen
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 畢業(yè)論文——建設(shè)工程竣工規(guī)劃條件核實(shí)測(cè)量
- 從竣工測(cè)量到規(guī)劃核實(shí)測(cè)量
- 畢業(yè)論文范文——建設(shè)工程竣工規(guī)劃條件核實(shí)測(cè)量
- 畢業(yè)論文范文——建設(shè)工程竣工規(guī)劃條件核實(shí)測(cè)量
- 規(guī)劃核實(shí)測(cè)量
- 建設(shè)工程竣工規(guī)劃核實(shí)
- 建設(shè)工程竣工規(guī)劃核實(shí)申請(qǐng)表
- 建設(shè)工程竣工規(guī)劃核實(shí)申請(qǐng)表
- 建設(shè)工程竣工規(guī)劃核實(shí)(驗(yàn)收)申請(qǐng)表
- 禹城建設(shè)工程竣工規(guī)劃核實(shí)管理規(guī)定
- 申請(qǐng)建設(shè)工程竣工規(guī)劃核實(shí)條件及必備資料
- 2016建筑面積計(jì)算與建設(shè)工程竣工規(guī)劃核實(shí)
- 禹城市建設(shè)工程竣工規(guī)劃核實(shí)管理規(guī)定
- 建設(shè)工程政道橋類竣工規(guī)劃核實(shí)申請(qǐng)表
- 建設(shè)工程竣工規(guī)劃核實(shí)驗(yàn)收申請(qǐng)表
- 建設(shè)工程竣工規(guī)劃核實(shí)意見書送達(dá)回證
- 長(zhǎng)沙工程建設(shè)地方技術(shù)規(guī)程
- 長(zhǎng)沙工程建設(shè)地方技術(shù)規(guī)程
- 探討建設(shè)工程竣工測(cè)量的技術(shù)應(yīng)用
- gps rtk測(cè)量技術(shù)規(guī)程
評(píng)論
0/150
提交評(píng)論