1、附錄:英文原文TEMPERATURE CONTROL OF THE MASSIVE CONCRETEOF THE KRASNOYARSK HYDROELECTRIC STATION DAMA. P. Dolrnatov and S. Z. Neidlin UDC 627.821.2 : 666.972.021.21.035.83(282.251.2)During recent years a number of large
2、 hydroschemes with high massive concrete dams have been bnilt in areas of the USSRin an area of extreme climate. A number of problems arise in the erection of massive dams under severe climatic conditions related to the
3、prevention of fissuring in the concrete and obtaining a monolithic structure.Typical features of the construction of large hydroschemes are the large volumes of concrete and the extremely limited time for pouring them, w
4、hich means a high rate of concrete placing.Measures for controlling the temperature of the concrete on a large scale were adopted practically for the first time in the Soviet Union in the construction of the Krasnoyarsk
5、hydrocomplex. The severe climatic conditions at the site (mean annual temperature +0.4 , maximum long range temperature +37and minimum, -54 ) introduced serious difficulties in obtaining monolithic mass structures and pt
6、aced special demands on the concrete and its placement. In order to obtain monolithic concrete structures,the “Technical regulations for carrying out concreting“ lays down the following temperature conditions for blocks
7、with columnar section (plan dimensions 15 x 11.5 m, height 3 to 9 m):a) maximum temperature in blocks placed on fresh concrete (less than 1 month old) must not exceed 40 ;b) maximum temperature in blocks placed on old co
8、ncrete (more than i month old) and rock must not exceed 28 ;c) the temperature drop between the core and faces must not exceed 23 ;The numerator shows the amount of concrete placed or cooled during the year; the denomina
9、tor shows the volume and increase in the amount.200,000 m S of this concrete was cooled using water cooled in a refrigeration plant.Concrete placing in the top section of the dam, which is intended for completion by 1969
10、-1970, will be carried out without artificial cooling.Cooling of the concrete during the construction of the Krasnoyarsk hydroelectric station was carried out in two stages. In the first stage cooling was used for reduci
11、ng the exothermic peak of the freshly placed concrete and in the second stage for further cooling of the mass down to the temperature where it is made monolithic.First stage cooling was carried out usually in the summer
12、only but from 1965, with the introduction of high blocks, it was carried out in winter. From 1966 the first stage cooling was carried out continuously for the purpose of improving the concrete stress in the immediate vic
13、inity of the cooling pipes, accelerating cooling of the block, for rendering the joints between columns monolithic and improving reliable performance of the cooling coils (leaching).The second stage usually starts at the
14、 end of August with a water temperature of 15-18 . During this period the concrete is cooled mainly from a temperature above 25-30 , for the purpose of further reducing the temperature towards the winter season and in pr
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 外文翻譯----克拉斯諾亞爾斯克水電站大壩大體積混凝土溫度控制
- 外文翻譯----克拉斯諾亞爾斯克水電站大壩大體積混凝土溫度控制
- 外文翻譯----克拉斯諾亞爾斯克水電站大壩大體積混凝土溫度控制.docx
- 外文翻譯----克拉斯諾亞爾斯克水電站大壩大體積混凝土溫度控制.docx
- 下屯水電站大壩大體積混凝土的溫度控制與防裂
- 大體積混凝土溫度裂縫控制
- 淺談大體積混凝土溫度裂縫控制
- 大體積混凝土溫度裂縫控制技術(shù)
- 功果橋水電站碾壓混凝土溫度控制
- 有效控制大體積混凝土溫度裂縫
- 大體積承臺混凝土溫度裂縫控制
- 大體積混凝土溫度裂縫控制研究.pdf
- 大體積混凝土溫度裂縫控制及分析
- 大體積承臺混凝土溫度裂縫控制
- 淺談牛頭山水電站大壩混凝土施工溫度控制
- 淺談牛頭山水電站大壩混凝土施工溫度控制
- 水電站大壩混凝土澆筑溫度控制措施和要點(diǎn)
- 底板大體積混凝土溫度裂縫控制研究
- 簡述大體積混凝土溫度控制措施
- 大體積混凝土溫度裂縫分析與控制
評論
0/150
提交評論