版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、河北工程大學(xué)碩士學(xué)位論文馬頭發(fā)電廠灰壩材料試驗與工程特性研究姓名:李峰申請學(xué)位級別:碩士專業(yè):水工結(jié)構(gòu)工程指導(dǎo)教師:李彥軍2011Abstract IIAbstract Ash field is to solve the problem of fly ash storage, protecting the environment and construction. Ash Field Ash Dam
2、 is the main building, is also an important part of thermal power plants. Recent years, with the growing number of thermal power plants and the increasing expansion of the scale, along with
3、ash dam technology has become more sophisticated. Or is the use of fly ash dam heightening fly ash dam, with investment, quick returns, significant economic benefits characteristic of ash dam
4、construction has become a new trend. However, the current technology is still in an ash dam engineering practice ahead of the state of design theory, and some technical problems in the theory
5、 can not give a satisfactory explanation. For example, superposition of filling stage the stability of the ash dam, seepage state of the sub- dam construction in the direct deposition of ash,
6、 the ash dam safety how to, sub- dam foundation is required to do a special foundation treatment. In this paper, four power plants in Handan gray matou field heightening project, for example,
7、 on the ash dam heightening project of the dam material, the physical properties of ash deposition and dam seepage and static and dynamic stability of the dam thematic studies . The main con
8、tents of this paper and results are as follows: (1) conducted a more comprehensive geological characteristics of ash dam project evaluation, made for Ash Seepage and stability analysis of a ty
9、pical engineering geological profile; (2) the use of Seepage hydraulics theory, took the child under water retaining dam of different transient seepage Ash Dam. Analysis showed that: the main a
10、nd sub- saturation line elevation lasted retaining dam, the dam material permeability and drainage facilities about. (3) During the obtained sub- retaining dam, the length of dry beach, fly ash
11、permeability, anisotropic permeability on the saturation line were investigated. (4) Application of the Study of Sweden and the Bishop method of dam in the typical conditions for the stability
12、 of checking. The theoretical analysis and experimental results on the actual dam construction in the water body in the form of ash, and the slope rate of the selected location has certain r
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 馬頭發(fā)電廠灰壩材料試驗與工程特性研究.pdf
- 馬頭發(fā)電廠發(fā)展戰(zhàn)略研究.pdf
- 馬頭發(fā)電廠的經(jīng)營現(xiàn)況分析與改進策略研究.pdf
- 馬頭發(fā)電廠200MW機組大修項目管理研究.pdf
- 馬頭發(fā)電廠200MW機組熱經(jīng)濟性在線監(jiān)測的研究.pdf
- 馬頭發(fā)電廠8#發(fā)電機轉(zhuǎn)子匝間短路診斷系統(tǒng)的研制.pdf
- mba論文某發(fā)電廠房裝飾裝修工程成本控制研究pdf
- 發(fā)電廠論文
- 石嘴山發(fā)電廠堿性灰漿脫硫與輸灰管防垢的模擬試驗研究.pdf
- 垃圾焚燒發(fā)電廠飛灰重金屬特性及穩(wěn)定化研究.pdf
- 畢業(yè)論文范文——發(fā)電廠輸灰系統(tǒng)plc設(shè)計
- 火力發(fā)電廠除灰專業(yè)試題
- 發(fā)電廠工程在線作業(yè)
- mba論文南陽鴨河口發(fā)電廠脫硝項目前評估研究pdf
- mba論文馬頭調(diào)研究pdf
- 發(fā)電廠電機預(yù)防性試驗研究.pdf
- 電廠灰壩滲流穩(wěn)定研究.pdf
- 水城發(fā)電廠灰水系統(tǒng)阻垢研究及應(yīng)用.pdf
- 《發(fā)電廠電氣部分》論文核能發(fā)電廠與我國核電發(fā)展
- 廣州發(fā)電廠脫硫工程的研究.pdf
評論
0/150
提交評論