2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩198頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Bus stops create permanent bottleneck on the urban roadways within cities when passengers geton and off the bus and thereby causing decrease in curb lanes' capacity. The study of bus stopsinfluencing on the capacity of s

2、ignalized intersections has been attempted by several scholarsand researchers from both home and abroad. However, studies of bus stops' impact on capacityof curb lanes are found to be very few. The objective of this stud

3、y is to investigate thequantitative impacts of bus stops on capacity of curb lanes for the four categories of roadways inBeijing. Two types of bus stops such as bus bays and curbside bus stops impacts on capacity ofcurb

4、lanes have been investigated for these four categories, namely expressways, major roads,minor roads and tertiary streets. Data have been collected at bus bays and curbside bus stopsrespectively for each of the four categ

5、ories of roadways by video graphing or videotaping. New concepts of bus impact time occupancy rate or ratio and bus impact time (main parameter)have been introduced in the study. Relationships among bus deceleration

6、time, bus accelerationtime, bus stop occupancy time (bus dwell time) and bus impact time have been established whenbuses maneuver to pull into and out of the bus stops, from field observation. A statisticalrelationship b

7、etween bus impact times and bus arrival frequencies (volumes) has beenestablished using a Statistical Program for Social Sciences, (SPSS I3) for Windows. Three scenarios for collection of bus impact times and bus arr

8、ival tcequencies data have beenconsidered. Models of quantitative impacts of bus stops on capacity of curb lanes for the threescenarios were built and calibrated for the bus parameters (bus impact time and bus arrivalfre

9、quency) using the collected data from fifty bus stops. After the analysis of bus parameters bythe employment of SPSS 13 for Windows software and calibration of the models, the followingfacts have been established: 1.

10、Relationship between Bus Impact Time, T (bus main parameter) and Capacity of Curb Lane, C. 2.Statistical Correlation between Average Bus Impact Time, T and the Average Bus Arrival Frequency,λ. The models are very

11、 useful for the estimation of potential capacity of curb lanes under bus stopsand buses'influence on the four categories of road in Beijing. Finally these models are veryuseful and can be used as the analysis tools by En

12、gineers and Planners of the traffic and transportation professions to provide technically-sound advice to: (1) Public TransportOperators- for bus operation and urban bus management. (2) Department of Urban Planning

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論