2023年全國(guó)碩士研究生考試考研英語(yǔ)一試題真題(含答案詳解+作文范文)_第1頁(yè)
已閱讀1頁(yè),還剩56頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、西安科技大學(xué)碩士學(xué)位論文基于GIS 的橋梁狀態(tài)評(píng)估信息系統(tǒng)研究姓名:侯林濤申請(qǐng)學(xué)位級(jí)別:碩士專業(yè):地圖學(xué)與地理信息系統(tǒng)指導(dǎo)教師:邱春霞2011Subject : Research on Information System of Evaluation of Bridge Based on GIS Specialty :Cartography and Geographic Information System Name :H

2、ou Lin-tao (Signature) Instructor :Qiu Chun-xia (Signature) ABSTRACT Some foreign countries have developed some mature bridge management systems,but it can not

3、 be used directly in our country because the management system and the national code for repair and maintenance is different.Some bridge management systems are developed in our country,but they are all running in test.So

4、 the main research subject in the thesis is to study some problems for developing suitable bridge management system for our country bridge management. The contents of the research work are summarized below: (1) Basing on

5、 the research on present situation of bridge, points out the problem that defect state of bridge do not establish unified effective evaluation standard, and hardly reflect severity of defects of components has influence

6、on the whole bridge. Some standards and evaluation approachs are not according to concrete bridge style. Thus, according to analytic hierarchy process and constant weighting method put forward uncertain analytic hierarch

7、y process and variable weighting method. (2)According to the defact of visual detection evaluation, which caused by human factors, and basing on the information of bridge defect, the paper puts forward uncertain analyti

8、c hierarchy process and variable weighting method as tools to evaluate by different analytic hierarchy models and rational weight distribution to the bridges which have different structures, because it can fully reflect

9、in overall evaluation when individual components exist great defects. This method can make bridges evaluation more scientific and rational, and make evaluation process easy. (3)Combining with GIS, targeted with getting t

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論