1、<p>  JCS 27.060.30</p><p><b>  J98</b></p><p>  備案號: J13772012</p><h4>  中華人民共和國電力行業(yè)標(biāo)準(zhǔn)</h2><p>  DL5190.2 -2012</p><p>  代替DL / T 5047

2、 -1995</p><p>  電力建設(shè)施工技術(shù)規(guī)范第 2 部分: 鍋爐機(jī)組</p><p>  Technical specification for thermal power erection and construction Part 2: boiler unit</p><p>  2012-01-04發(fā)布2012-03-01 實(shí)施</p>

3、;<p><b>  國家能源局發(fā)布</b></p><p>  中華人民共和國電力行業(yè)標(biāo)準(zhǔn)</p><p>  電力建設(shè)施工技術(shù)規(guī)范第 2 部分: 鍋爐機(jī)組</p><p>  Technical specification for thermal power erection and construction Part 2:

4、 boiler unit</p><p>  DL 5190.2—2012</p><p>  代替DL / T 5047 -1995</p><p>  主編機(jī)構(gòu):中國電力企業(yè)聯(lián)合會批準(zhǔn)部門:國家能源局 施行日期: 20 1 2 年 3 月 1 日</p><p><b>  中國電力出版社</b></p

5、><p><b>  2012北京</b></p><p>  中華人民共和國電力行業(yè)標(biāo)準(zhǔn)電力建設(shè)施工技術(shù)規(guī)范 第 2 部分: 鍋爐機(jī)組</p><p>  Technical specification for thermal power erection and construction Part 2: boiler unit</p&

6、gt;<p>  DL 51 90.2 一 201 2</p><p>  代替 DL叮 5047 — 199 5</p><p>  中國電力出版社出版、發(fā)行</p><p> ?。ū本┦袞|城區(qū)北京站西街 19 號 100005httpc//www.cepp.sgcc.com.cn)</p><p>  北京博圖彩

7、色印刷有限公司印刷</p><p>  2012 年3 月第一版2012年 3 月北京第一次印刷</p><p>  850 毫米X 1168 毫米 32 開本 7.625印張188 于字</p><p>  印數(shù) 0001—3000 冊</p><p>  統(tǒng)一書號 155123? 848定價(jià) 62.00元</p>&l

8、t;p><b>  敬告讀者</b></p><p>  本書封面貼有防偽標(biāo)簽,刮開涂層可查詢真?zhèn)伪緯缬杏⊙b質(zhì)量問題,我社發(fā)行部負(fù)責(zé)退換版權(quán)專有翻印必究</p><p>  DL5190.2一2012</p><p>  本部分是根據(jù)《國家能源局關(guān)千下達(dá)2009 年第一批能源領(lǐng)</p><p>  域行業(yè)標(biāo)準(zhǔn)制(

9、修)訂計(jì)劃的通知》(國能科技( 2009) 163 號) 文的要求,由電力行業(yè)火電建設(shè)標(biāo)準(zhǔn)化技術(shù)委員會負(fù)責(zé),會同有關(guān)單位在《電力建設(shè)施工及驗(yàn)收技術(shù)規(guī)范(鍋爐機(jī)組篇)D》L/T</p><p>  5047—1995的基礎(chǔ)上修訂的。</p><p>  DL 5190《電力建設(shè)施工技術(shù)規(guī)范》共9 個(gè)部分:</p><p>  第 1 部分土建工程</p>

10、<p>  - — 第 2 部分鍋爐機(jī)組</p><p>  第 3 部分汽輪發(fā)電機(jī)組</p><p>  第 4 部分熱工儀表及控制裝置</p><p>  第 5 部分管道及系統(tǒng)</p><p>  第 6 部分水處理及制氫設(shè)備和系統(tǒng)</p><p>  第 7 部分焊接工程</p&

11、gt;<p>  第 8 部分加工配制</p><p>  第 9 部分水工結(jié)構(gòu)</p><p>  本部分是DL 5190 的第2 部分: 鍋爐機(jī)組。</p><p>  本部分主要內(nèi)容包括電站鍋爐本體鋼結(jié)構(gòu)、受熱面、煙風(fēng)系統(tǒng)、脫硫脫硝、除塵、燃料供應(yīng)系統(tǒng)、灰渣系統(tǒng)、鍋爐輔助機(jī)械、 鍋爐爐墻及熱力系統(tǒng)設(shè)備與管道保溫防腐等安裝施工及質(zhì)量驗(yàn)收的技術(shù)規(guī)

12、范。</p><p>  本部分與DL 5047一1995相比主要技術(shù)變化如下:</p><p>  —明確了強(qiáng)制性條文。</p><p>  -—刪除了原規(guī)范中目前新建電站鍋爐基本不采用的設(shè)備及 相關(guān)施工內(nèi)容,如水膜式除塵器、水力除灰除渣系統(tǒng)及部分陸續(xù)淘汰的高能耗輔機(jī)設(shè)備、磚砌爐墻、敷管爐墻</p><p>  及框架式耐火混凝土爐墻施工等

13、章節(jié)內(nèi)容。</p><p>  ——增加了有關(guān)循環(huán)流化床鍋爐的內(nèi)容, 其中 " 5 受熱面” 中增加了" 5.6 循環(huán)流化床鍋爐受熱面設(shè)備” 條款; 在" 6 鍋爐附屬管道及附件” 中增加了" 6.2 減溫水管道”、" 6.3 啟動系統(tǒng)” 條款; 在 " 7 煙風(fēng)道、燃(物)料管道及附屬設(shè)備” 中增加了“燃(物)料管道” 等內(nèi)容和 " 7.

14、4 爐膛及煙風(fēng)系統(tǒng)密封性試驗(yàn)”相關(guān)條款; " IO 鍋爐輔助機(jī)械"中增加了干式除灰除渣設(shè)備、直吹式雙進(jìn)雙出鋼 球磨煤機(jī)和循環(huán)流化床鍋爐輔機(jī)等設(shè)備安裝內(nèi)容。</p><p>  對部分章節(jié)中的內(nèi)容進(jìn)行了合理調(diào)整; 其中 " 12 爐墻砌筑及熱力設(shè)備和管道的保溫、防腐”有關(guān)章節(jié)做了較大修訂;將垃圾焚燒鍋爐、生物質(zhì)焚燒鍋爐、燃機(jī)余熱鍋爐單獨(dú)做成附錄。共新增附錄7 個(gè), 更新附錄7 個(gè), 取消原附錄1

15、1 個(gè)。</p><p>  本部分中的第3.1.S 條、3.1.7 條、3.1.11 條、4.3.9 條第 1 款、</p><p>  4.3.9 條第2 款、S.1.4 條、S.1.6 條第1 款、S.2.7 條、6.1.2 條、7.3.4 條第2 款、9.1.8 條、9.1.11 條、9.5.6 條、9.7.1 條、9.8.3 條、9.8.S 條、13.6.7 條以黑體字標(biāo)識, 為

16、強(qiáng)制性條文 , 必須嚴(yán)格執(zhí)行。</p><p>  本部分由中國電力企業(yè)聯(lián)合會提出。</p><p>  本部分由電力行業(yè)火電建設(shè)標(biāo)準(zhǔn)化技術(shù)委員會歸口。</p><p>  本部分主編單位:廣東火電工程總公司、浙江省火電建設(shè)公司。</p><p>  本部分參編單位:湖南省火電建設(shè)公司、天津電力建設(shè)公司、安徽電力建設(shè)第二工程公司、寧夏電力建設(shè)

17、工程公司、河北省電力建設(shè)第一工程公司、湖南省電力公司試驗(yàn)研究院、新疆電力科學(xué)研究院。</p><p>  本部分主要起草人:李鵬慶、豐斌、姚建民、張軍、謝鴻鋼、李春濤、徐立東、周德福、邵長宏、李金璽、黃偉、王涌、張建鋒、余承鵬、周石平。</p><p><b>  II</b></p><p>  本部分主要審查人:宋志毅、張所慶、司廣全、李牧

18、、梁燕鈞、才延福、周捷、華國鈞、劉耀明、張軍威、楊亞東、周奎應(yīng)、李永生、劉繼祿、雷兆團(tuán)、李維國、黎軍保、韓璽、裴江、杜建</p><p>  橋、王永益、鄭堅(jiān)、吳賢輝、段耀全、曹生堂。</p><p>  本部分自實(shí)施之日起代替 our 5047一1995《電力建設(shè)施工及驗(yàn)收技術(shù)規(guī)范(鍋爐機(jī)組篇)》。</p><p>  本部分在執(zhí)行過程中的意見或建議反饋至中國電力

19、企業(yè)聯(lián)合會標(biāo)準(zhǔn)化管理中心(北京市白廣路二條一號, 100761)。</p><p><b>  目次</b></p><p><b>  前言.I</b></p><p><b>  I總則.1.</b></p><p><b>  2術(shù)語.2</b&

20、gt;</p><p><b>  3基本規(guī)定.5</b></p><p>  3.1一般規(guī)定.5</p><p>  3.2安裝與建筑的銜接.........................…........................................ g</p><p>  4

21、鍋爐構(gòu)架及有關(guān)金屬結(jié)構(gòu)..…...........……………………·……·……·… 9</p><p>  4.1一般規(guī)定.9</p><p>  4.2鍋爐基礎(chǔ)檢查、劃線和墊鐵安裝·…........…………………………·…10</p><p>  4.3鍋爐構(gòu)架安裝和二次灌漿….......…. 

22、83;…………………·…·……·… 11</p><p>  爐門、窺視孔和爐墻零件.15</p><p>  鍋爐密封部件.16</p><p><b>  燃燒裝置.17</b></p><p><b>  空氣預(yù)熱器.20</b></p>

23、<p><b>  工程驗(yàn)收.23</b></p><p><b>  5受熱面.25</b></p><p><b>  一般規(guī)定.25</b></p><p>  汽包、汽水分離器、聯(lián)箱.28</p><p>  5.3水冷壁.29</p>

24、;<p>  5.4過熱器、再熱器、省煤器和減溫器…30</p><p>  5.5爐水循環(huán)泵及啟動循環(huán)泵……...…. ………·… 32</p><p>  循環(huán)流化床鍋爐受熱面設(shè)備.33</p><p><b>  水壓試驗(yàn).36</b></p><p><b>  工程

25、驗(yàn)收.38</b></p><p><b>  N</b></p><p>  鍋爐附屬管道及附件…39</p><p><b>  一般規(guī)定.39</b></p><p>  鍋爐排污、取樣、加熱、疏放水、排汽和減溫水管道.39</p><p>  6.

26、3啟動系統(tǒng).........拿.40</p><p>  6.4汽包水位計(jì).40</p><p>  6.5安全閥.41</p><p>  6.6吹灰系統(tǒng).42</p><p>  6.7工程驗(yàn)收.......................今.43</p><p>  煙風(fēng)道、燃(物)料管道及附

27、屬設(shè)備44</p><p><b>  一般規(guī)定.44</b></p><p>  煙風(fēng)道、燃(物)料管道的組合及安裝.45</p><p>  煙風(fēng)道、燃(物)料管道附件及裝置…·…45</p><p>  7.4爐膛及煙風(fēng)系統(tǒng)密封性試驗(yàn)..........曾..….</p><

28、p>  ·………………..…·…·…... 4g</p><p>  7.5除塵器.49</p><p>  7.6工程驗(yàn)收...................................................卓.55</p><p>  8脫硫脫硝............................

29、.....:.....................今.56</p><p><b>  一般規(guī)定.56</b></p><p><b>  煙氣脫硫.57</b></p><p>  8.3煙氣脫硝.........................................................

30、........拿............. 6]</p><p>  8.4工程驗(yàn)收.65</p><p>  燃油系統(tǒng)設(shè)備及管道.66</p><p><b>  一般規(guī)定.66</b></p><p>  卸油裝置及卸油管道.67</p><p>  油罐及其附件.67

31、</p><p>  供油設(shè)備及泵房管道.68</p><p>  9.5廠區(qū)燃油管道..................................................................,....?68</p><p>  9.6鍋爐房燃油管道.69</p><p>  9.7燃油系統(tǒng)吹洗及通油試驗(yàn).

32、...…. ….......…·…..…. …….........…·… 69</p><p>  DL S190.2 -2012</p><p>  9.8燃油系統(tǒng)受油前應(yīng)具備的條件………………………………………· 7…0</p><p>  9.9工程驗(yàn)收······

33、;····································

34、83;····························7··0······

35、;</p><p>  鍋爐輔助機(jī)械.72</p><p>  JO.I一 般規(guī)定·························

36、83;··················7·2·······</p><p>  10.2輔機(jī)安裝通則.72</p><p>

37、  10.3輔機(jī)油系統(tǒng)........…..........…·······························&#

38、183;············8·1·····</p><p>  10.4磨煤機(jī)············

39、83;····································&

40、#183;················8·3···········</p><p>  10.5風(fēng)機(jī).93</p>

41、<p>  10.6給煤機(jī).................................................................................9g</p><p>  10.7空氣壓縮機(jī).100</p><p>  10.8除灰設(shè)備,·······

42、3;····································&#

43、183;····························· 101</p><p>  10.9撈渣機(jī)·

44、····································

45、3;·································1·0··

46、2·····</p><p>  10.10碎渣機(jī),.105</p><p>  JO.II鏈斗輸送機(jī).105</p><p>  斗鏈提升機(jī).105</p><p>  冷渣器設(shè)備.106</p><p>  10.14工程驗(yàn)收.107</p&g

47、t;<p><b>  1111.它定口</b></p><p>  膠帶輸煤機(jī).108</p><p>  膠帶輸煤機(jī)的卸煤設(shè)備.114</p><p>  11.4磁鐵分離器,.115</p><p>  11.5碎煤機(jī).115</p><p>  11.6篩煤機(jī)

48、.117</p><p>  11.7卸車設(shè)備及煤場設(shè)備....……·······.118</p><p>  11.8工程驗(yàn)收.123</p><p>  爐墻砌筑及熱力設(shè)備和管道的保溫、防腐..…………………· 124</p><p>  12.1

49、一 般規(guī)定····································

50、;·················1·2··4········</p><p>  DL 5190.2一2012</p>

51、<p>  12.2耐火、保溫材料.......….·············…··················

52、···············1··2·5··</p><p>  12.3不定型耐磨耐火材料施工…·······….......…………………

53、 128</p><p>  12.4爐襯砌筑施工..........….···················…............….…······

54、83;···…· 131</p><p>  12.5鍋爐本體、熱力設(shè)備及管道保溫層施工.........…. …….....……·· 133</p><p>  12.6鍋爐本體、熱力設(shè)備及管道保溫外護(hù)層施工………·… 136</p><p>  12.7防腐施工...........…

55、...........…......................…. .................…· 139</p><p>  12.8季節(jié)性施工........….··················

56、3;·················…···················&

57、#183;l·41</p><p>  12.9工程驗(yàn)收...............…................…·······················

58、83;···········l·4··2</p><p>  13 鍋爐機(jī)組啟動試運(yùn)及驗(yàn)收…………………………………......……· 143</p><p>  13.1一般規(guī)定·····

59、····································

60、3;············I·4·3·········</p><p>  13.2鍋爐試運(yùn)要點(diǎn)..............…........................…

61、83;······················1··44</p><p>  13.3高溫烘爐·…·····&

62、#183;····································

63、;········· … ·················l 46</p><p>  13.4鍋爐化學(xué)清洗.....…. ............

64、.......…···································l&

65、#183;4··7</p><p>  13.5管道的沖洗和吹洗.........................…·······················&

66、#183;·······l··4·9</p><p>  13.6蒸汽嚴(yán)密性試驗(yàn)及安全閥調(diào)整…….….........……………………·· 151</p><p>  13.7整套啟動試運(yùn)行······

67、83;····································&

68、#183;············I·5··2······</p><p>  13.8工程驗(yàn)收·········

69、····································

70、3;·················l··5·3·········</p><p>  附錄A 垃圾焚燒鍋爐安裝

71、83;…………·………....…..…. ……...………·· 154</p><p>  附錄B生物質(zhì)焚燒鍋爐安裝……······…….....…………..........… 159</p><p>  附錄C 燃?xì)庖徽羝?lián)合循環(huán)電站余熱鍋爐安裝………....……·· 164

72、 附錄D 鍋爐鋼結(jié)構(gòu)的制造和裝配公差………………………·········l 68附錄E 火電安裝中常用鋼材的臨界溫度…………..….··········…·· 178附錄F 鍋爐基礎(chǔ)軸線與外形尺寸允許偏差...….……

73、……······ …· 179 附錄G 高強(qiáng)度螺栓連接工程檢驗(yàn)項(xiàng)目…180</p><p>  附錄H管式空氣預(yù)熱器的制造和裝配公差..…. ..………………·· 18 7</p><p>  附錄J受熱面管的外徑和壁厚的允許偏差·····&#

74、183;·· 189</p><p>  附錄 K水壓試驗(yàn)臨時(shí)管路與堵頭的強(qiáng)度計(jì)算要求……………·· 191</p><p>  附錄L煙風(fēng)道、燃(物)料管道制造尺寸的允許偏差········1·93</p><p><b&g

75、t;  VN</b></p><p>  DL 5190.2 -2012</p><p>  附錄M濾袋檢驗(yàn)要求及濾袋安裝預(yù)緊力理論計(jì)算值·…194</p><p>  附錄N大型動力設(shè)備基礎(chǔ)的允許偏差..….……….....……………· 19 6</p><p>  附錄P軌道鋪設(shè)要求……………&#

76、183;····…·················· 197</p><p>  附錄Q主要設(shè)備、管道油漆顏色及色標(biāo)涂刷.…·····

77、83;········…· 198</p><p>  標(biāo)準(zhǔn)用詞說明...............................….·············· … ·

78、83;························· 201</p><p>  弓1用 標(biāo) 準(zhǔn) 名 錄........................…...

79、·.···································

80、83;··2·0··2······附:條文說明·······················

81、3;··································…··&

82、#183;············2··0·5</p><p><b>  Contents</b></p><p><b>  PrefaceI</b></p><p>

83、  IGeneral prov1s1ons·.............···....··..···..............................…. ........ ,J</p><p><b>  Terms2</b></p><p>  B.as1c

84、 reqmrement5</p><p>  General provisions5</p><p>  The relationship between installation and civil in plant</p><p>  construcl!on8</p><p>  Boiler Frame works and

85、Metal Structures·9</p><p>  4.1Genera1 prov1S1ons·....···......·····....··..·.................·.......··......·......

86、83;9</p><p>  Boiler foundation check,mark,parallels erection .......…. .....…………· 10</p><p>  Boiler framework erection and grouting11</p><p>  Fure door, peepdoor and fur

87、nace wall accessory……………·…·………15 4.5Boiler sealing·..···.16</p><p>  Combusl!on apparatus····.17</p><p>  Air preheater20</p><p&

88、gt;  Acceptance and check23</p><p>  Bmler pressure parts25</p><p><b>  5.1</b></p><p>  General prov1S1ons25</p><p>  Steam drum, steam-water separator,

89、 header28</p><p>  Water wall,29</p><p>  Superheater, reheater, economizer, desuper heater30</p><p>  Boiler circulation pump, startup c訂culation pump ..…· 32</p>

90、<p>  Circulation fluidized bed boiler pressure parts ………·………..…. ·….. 33 5.7Boiler hydraulic test36</p><p>  DL 5190.2 -2012</p><p>  5.8Acceptance and check--··&#

91、183;········--···········--··--··--··--··----------··-38</p><p&

92、gt;  Boiler Accessorial Pipelme and Accessones …………………······--· 39 6.1General provisions·------·······--··--····&#

93、183;··------··--······--··--··········--···--·39</p><p>  6.2Pipeline of boi

94、ler blowdown , sampling , heating, drainage, exhaust</p><p>  steam and attemperatmg water piping………………………………·…·· 39 6.3Start-up system······.40</p><

95、p>  6.4Steam drum water stage gauge···············..···········.40</p><p&g

96、t;  6.5Safety valve41</p><p>  6.6Soot blower system ......................................................----.42</p><p>  6.7Acceptance and check·······

97、;······--·······..·······.43</p><p>  Flue gas duct, Air Duct ,Coal Dust Pipe, Fuel Channel</p><

98、;p>  and Accessory ..·········....···…· 44</p><p>  71.General prov1s1ons ..······--····

99、;···..·······..·······.......······..··..····..44</p><p>  Fl

100、ue gas duct, air duct ,coal dust pipe, fuel channel assembly and erecllon·····.45</p><p>  Flue gas duct, air duct ,coal dust pipe, fuel channel device and accessory··

101、3;····································&#

102、183;·········..·········.45</p><p>  Leakage test of the flue gas ,air duct and furnace chamber …………··

103、3; 48 7.5D 匹 t catcher························..·······.49</

104、p><p>  7.6Acceptance and check-···········--·······..·······.55</p><p&g

105、t;  8Desulfurization and Denitrat1on ...........·--··--·······.56</p><p>  8.1General prov1s10ns········..

106、83;······......................................------·----·56</p><p>  8.2Flue gas desulfurization···········&#

107、183;…· ..................................,??????.?? 57</p><p>  8.3Flue gas denitration·······--·--·····--·····

108、··------···········------····------···61</p><p>  8.4Acceptance and check·····--

109、···--·······--····…· ..·--------·········--·····------·65</p&

110、gt;<p>  9Fuel 011 System Devices and Pipe·…· ………………………·…----…..66 9.IGeneral proVISIODS·....….·····--······….........................

111、..............,.,66</p><p>  9.2Oil unloadmg device and pipe ...........................................--67</p><p>  9.3Oil tank and accessones········

112、;·························.67</p><p>  Fuel oil servicing facilities and pumping

113、house pipe…· 68</p><p>  Fuel oil pipe outside the boiler house·…· ……..…. .......…· 68</p><p>  Fuel oil pipe inside the boiler house······&#

114、183;·………......………………·… 69 9.7Fuel otl system test and blowing69</p><p>  Fuel oil system Prerequisite before oil-taking······…· …......… 70</p><p>

115、;  Acceptance and check70</p><p>  Boiler Auxiliary Machinery·················…· 72</p><p>  IO.IGene

116、ral provisions·······…· ...............… 72</p><p>  10.2 Machinery erection regulation··…···········

117、;·······························7··2· 10.3Auxilia

118、ry machine oil system··…· 81</p><p>  Coal rmll83</p><p><b>  Fan93</b></p><p>  Coal feeder98</p><p><b>  ::: 二二::二</b></

119、p><p>  I0.9Slag dragging machine .......................................................... I02</p><p>  10.10Slag crusher105</p><p>  IO.IIBucket conveyor-105</p><p&g

120、t;  Bucket chain105</p><p>  Ash cooler m邸 hine106</p><p>  Acceptance and check107</p><p>  Coal Handling Plant108</p><p>  11.1General provisions·.108</

121、p><p>  11.2Belt coal conveye,..........................................…. ·….............. ,os</p><p>  Coal unloading device for the belt coal conveyer ...…. ....…. ·… 114</p>

122、<p>  Magnetic separator·.115</p><p>  Coalcrusher··.115</p><p>  Coal screen117</p><p>  Unloading equipment and coal y江 d…· 118</p><p> 

123、 DL S190.2一2012</p><p>  11.8Acceptance and check···…· ..….··········…···········

124、;·················1··2·3··</p><p>  Furnace Wall Masonry, Thermal Equipment and Piping Insulation

125、, Anticorrosion···…..........…….........…·…·…············1·24</p><p>  12.1General provisions····

126、;···················…· …·….....…·············

127、3;····1··2·4</p><p>  12.2Refractories, insulatiou material··················

128、3;·····--·····----··----·125</p><p>  12.3Irregular refractones aod abrasion material construction·······

129、……· 128 12.4 Furnace !ming masonry work…········…·.·..·…. ......…·············1··31&

130、lt;/p><p>  losulation construction of boiler body ,thermal equipment aod p1pmg······················

131、;····································

132、83;·····················l33</p><p>  Construction of insulatiou outer protective cover of boiler</p

133、><p>  body, thennal equipment and piping······…· ........................… 136</p><p>  Painting, anticorroSion construction…….....…..…..…...……·……· 13

134、9 12.8Seasonal construction·····················…···········

135、;···················1··4··1·· 12.9Acceptance and check142</p><p>  Start-up Com

136、missioning and Acceptance Inspection of</p><p>  Boiler & Unit······…· .................................… 143</p><p>  General prov1s1ons143</p>&

137、lt;p>  G"ist of b01ler commissioning144</p><p>  Furnace drying with high temperature ………………………..…..·.··146 13.4Che.皿 cal cleanmg of boiler147</p><p>  13.5Rinse and b

138、low wash ofconduit···············…· .....................…··· 149</p><p>  Steam leak test and safety valve regu

139、late…………………………..1..5.1</p><p>  Complete set start-up for commissioning operation…· .............…· 152 13.8 Acceptance and check···········…

140、····································

141、3;·1·5··3····</p><p>  Appendix AInstallation of refuse incinerator154</p><p>  Appendix B Installation ofbio-fuel boiler……………·……………··

142、·159 Appendix C Installation of heat recovery boiler for gas turbine··… 164 Appendix D Fabricating and assembling tolerances of boiler</p><p>  steel structure·····

143、83;·······················?168</p><p>  Appendix EReference data of critical temperature o

144、f frequently-used rolled steel for erection of thermal</p><p>  power plant eq111pment·····…………………·………… 178</p><p>  Appendix FAllowable deviations of overall dim

145、ensions of boiler</p><p>  foundat:lon179</p><p>  Appendix GInspection items of connection of high</p><p>  strength bolts180</p><p>  Appendix HManufacture and fi

146、t tolerance of tubular</p><p>  type air preheater·······················…· 187</p&

147、gt;<p>  Appendix JAllowable deviations of outer diameter and wall thickness of heating surface tubes ……………···········1· 89</p><p>  Append

148、ix KStrength calculation requirements of temporary pipelines and blank plugs for Hydraulic Test……191</p><p>  Appendix LAllowable deviations of manufacturing dimensions of</p><p>  arr/ gas/c

149、oal ducts··…·································

150、·······1··9·3··· Appendix MInspection requirements and theoretical calculating</p><p>  tension values of filter bags ….......…...…. …...…

151、83;……· 194 Appendix NAllowable deviations of foundations for large scale</p><p>  power eqwpment196</p><p>  Appendix PStandards for track laying………..…..·…………………·· 197 App

152、endix QPainting colours for major equipment and</p><p>  pipelines198</p><p>  Explanation of Wording in This Standard……….…..·…...……………· 201 List of Quoted Standards··

153、3;···········…·························&

154、#183;··············2··0·2··· Addition: Explanation of Provision…………..…..............…·… 205</p><p>&l

155、t;b>  1總貝.</b></p><p>  為了進(jìn)一步提高電站鍋爐安裝施工水平,促進(jìn)技術(shù)進(jìn)步, 適應(yīng)科學(xué)發(fā)展,確保工程質(zhì)量和安全生產(chǎn),特修訂本部分。</p><p>  本部分適用千蒸發(fā)量 為 400t/h ~ 3 l 50t/h, 主蒸汽壓力為</p><p>  9MPa~28MPa, 主蒸汽溫度為 540"C ~ 610&

156、#39;C電站鍋爐機(jī)組的施工及驗(yàn)收。</p><p>  進(jìn)口機(jī)組的施工及驗(yàn)收應(yīng)執(zhí)行合同的規(guī)定,如合同無明確規(guī)定,則應(yīng)執(zhí)行本部分。</p><p>  垃圾焚燒鍋爐、生物質(zhì)焚燒鍋爐、燃機(jī)余熱鍋爐的施工及驗(yàn)收工作使用本部分附錄A、附錄 B、附錄 C。</p><p>  電站鍋爐安裝施工及驗(yàn)收除應(yīng)符合本部分外,尚應(yīng)執(zhí)行國家、行業(yè)現(xiàn)行有關(guān)標(biāo)準(zhǔn)規(guī)定。</p>

157、<p>  DL S190.2 -2012</p><p><b>  2術(shù)語</b></p><p>  間距偏差distance deviation</p><p>  表示鍋爐結(jié)構(gòu)、設(shè)備部件設(shè)計(jì)中心線之間相對尺寸安裝時(shí)允許的偏差(如柱子之間、橫梁之間、水冷壁與鋼結(jié)構(gòu)之間等)。</p><p> 

158、 對角線差diagonal deviation</p><p>  表示鍋爐結(jié)構(gòu)、設(shè)備部件外形設(shè)計(jì)方形或矩形縱橫中心線交叉點(diǎn)之間兩對角線長度之差值(如基礎(chǔ)、柱子、爐膛等)。</p><p>  標(biāo)高偏差elevation deviation</p><p>  表示鍋爐結(jié)構(gòu)、設(shè)備部件安裝高度與設(shè)計(jì)標(biāo)高之差值,一般 均以鋼架 Im 標(biāo)高為基準(zhǔn)。鍋爐本體各專業(yè)(鋼架

159、、金屬結(jié)構(gòu)、受熱面、六道、爐墻保溫等)應(yīng)統(tǒng)一使用經(jīng)計(jì)量檢定合格的測量 工具或儀器。</p><p>  平行度 depth of parallelism</p><p>  表示兩個(gè)相互平行的線或面間的平行程度。其偏差應(yīng)為該兩平行線或面之間兩端最小垂直距離之差。</p><p>  垂直度perpendicularity</p><p> 

160、 表示要求垂直的軸線與平面或兩平面之間所形成的角度與直角之差。其偏差以該軸線或平面與理想垂直線的夾角來表示,或以基準(zhǔn)垂直軸線單位長度與所測線或面的最小距離4 之比表示, 如Ll/m。</p><p>  相對錯位dis斗ignm ent</p><p>  表示兩物件(構(gòu)件、管件等)安裝位置與設(shè)計(jì)中心線位置均有偏差,而偏差方向相反,相對錯位為兩個(gè)偏差絕對值之和?;螂m偏差方向相同但偏差值不

161、同,相對錯位為兩個(gè)偏差絕對伯之差。</p><p>  同心度coaxiality</p><p>  表示兩個(gè)圓形物體安裝在同一中心軸線上(如球磨機(jī)端蓋與罐體、兩端空心軸中心線與罐體中心線、回轉(zhuǎn)式空氣預(yù)熱器的風(fēng)道轉(zhuǎn)動部分的頸部接口、風(fēng)機(jī)動葉調(diào)節(jié)裝置等)要求同心,其同心程度為兩圓心間的距離。</p><p>  圓度roundness</p>&l

162、t;p>  表示大型圓形物體(如回轉(zhuǎn)式空氣預(yù)熱器定子或轉(zhuǎn)子、回轉(zhuǎn)風(fēng)罩、風(fēng)機(jī)罩殼等)的周邊(部分或局部)與理想圓周邊之差,</p><p>  平整度flatness</p><p>  表示安裝部件的某一平面上局部凸起或同一平面上的局部凹陷的最大差值,</p><p>  平面度planeness</p><p>  表示一平面偏離

163、理想平面的程度。其偏差如為設(shè)定平面與實(shí)際平面之間的距離值; 以Ll/m 表示。</p><p>  徑向跳動radial run-out</p><p>  用百分表垂直指向被測斷面的軸心,盤動轉(zhuǎn)子,被測表面上各點(diǎn)(一般等分八點(diǎn)或十六點(diǎn))讀數(shù)的最大與最小值之差,為徑向跳動值。</p><p>  軸向跳動axial run-out</p><

164、p>  亦可稱“端面款偏”在被測端面給定直徑的圓周上,相對</p><p>  18礦 位置各安放一個(gè)垂直千端面的百分表 , 盤動轉(zhuǎn)子, 兩表同時(shí)指示的最大差值減去最小差值,取其半數(shù),即為軸向跳動值(或稱飄偏值)。</p><p>  水平偏差horizontal deviation</p><p>  表示鍋爐汽包、聯(lián)箱等縱橫水平中心線(安裝前應(yīng)先校核制造

165、廠標(biāo)志的水平線沖眼是否正確),檢查四側(cè)沖眼是否安裝在同一 水平面上,縱、橫向兩點(diǎn)的高差即為(縱、橫)水平偏差。</p><p>  橢圓度ellipticity</p><p>  表示圓柱形軸或孔(環(huán))在某一橫剖面內(nèi)最大直徑與最小直</p><p>  徑之差,除以公稱直徑,以百分率表示。橢圓度的圓心不固定, 最大直徑與最小直徑可在任意方向。</p>

166、<p>  水平度levelness</p><p>  表示要求安裝在同一水平面的物體,其相互間水平之差的程度, 一般用水 平尺、水平儀或 U 形管等測得各點(diǎn)之間的絕對差值。</p><p><b>  3基本規(guī)定</b></p><p>  3.1一般規(guī)定</p><p>  鍋爐機(jī)組

167、安裝工程施工單位應(yīng)具備相應(yīng)的施工資質(zhì);施工現(xiàn)場應(yīng)有經(jīng)審批的施工組織設(shè)計(jì)、施工方案等技術(shù)文件;并在開工前告知特種設(shè)備安全監(jiān)督管理部門。</p><p>  鍋爐機(jī)組安裝前施工圖紙應(yīng)通過相關(guān)單位會檢。</p><p>  本部分的強(qiáng)制性條文應(yīng)嚴(yán)格執(zhí)行,確保大容量、高參數(shù)電站鍋爐的安全可靠。</p><p>  鍋爐機(jī)組安裝工程應(yīng)按設(shè)計(jì)和設(shè)備技術(shù)文件施工。除符合本部分外,

168、有關(guān)泵類、管道、防腐、熱工測量儀表、焊接等部分尚應(yīng)符合國家和行業(yè)有關(guān)標(biāo)準(zhǔn)的規(guī)定:</p><p>  1泵類安裝應(yīng)執(zhí)行DL 5190.3《電力建設(shè)施工技術(shù)規(guī)范第</p><p>  3 部分: 汽輪發(fā)電機(jī)組》;</p><p>  熱工測量儀表安裝應(yīng)執(zhí)行DL 5190.4《電力建設(shè)施工技術(shù)規(guī)范第 4 部分:熱 工儀表及控制裝置》;</p><

169、;p>  鍋爐范圍內(nèi)的蒸汽管道、給水管道和工業(yè)水管道的安裝應(yīng) 執(zhí)行 DL 5190.5《電力建設(shè)施工技術(shù)規(guī)范 第 5 部分: 管道》和DL/T 7113《火力發(fā)電廠管道支吊架驗(yàn)收規(guī)程》;</p><p>  鍋爐本體受熱面及其他相關(guān)管系的防腐要求應(yīng)執(zhí)行 DL</p><p>  5190.6《電力建設(shè)施工技術(shù)規(guī)范 第 6 部分; 水處理及制氫設(shè)備和系統(tǒng)》;</p>

170、<p>  承 壓管道配制和安裝中的焊接工作應(yīng)執(zhí)行 our 869《火</p><p>  力發(fā)電廠焊接技術(shù)規(guī)程》;</p><p>  鍋爐起重設(shè)備等機(jī)械設(shè)備安裝應(yīng)參照 GB 50278《起重設(shè)</p><p>  備安裝工程施工及驗(yàn)收規(guī)范》、GB 50231《機(jī)械設(shè)備安裝工程施工及驗(yàn)收通用規(guī)范》;</p><p>  鍋爐鋼

171、結(jié)構(gòu)及附屬機(jī)械、設(shè)備的鋼結(jié)構(gòu),除按本部分外, 還應(yīng)參照 GB 50205《鋼結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》和JGJ 82</p><p>  《鋼結(jié)構(gòu)高強(qiáng)度螺栓連接技術(shù)規(guī)程》、DL廳 678《電站鋼結(jié)構(gòu)焊接通用技術(shù)條件》;</p><p>  鍋爐機(jī)組的啟動和驗(yàn)收應(yīng)符合本部分和DL廳 5437《火力發(fā)電建設(shè)工程啟動試運(yùn)及驗(yàn)收規(guī)程》。</p><p>  凡《特種設(shè)備安全

172、監(jiān)察條例》涉及的設(shè)備,出廠時(shí)應(yīng)附有安全技術(shù)規(guī)范要求的設(shè)計(jì)文件、產(chǎn)品質(zhì)量合格證明、安裝及使用維修說明、監(jiān)督檢驗(yàn)證明等文件。</p><p>  新產(chǎn)品和新設(shè)備的施工技術(shù)要求,如制造廠無明確要求時(shí), 應(yīng)由建設(shè)單位、監(jiān)理單位、設(shè)計(jì)單位、制造單位和施工單位共同研究制定,施工中遵照執(zhí)行。</p><p>  鍋爐機(jī)組在安裝前應(yīng)按本部分對設(shè)備進(jìn)行復(fù)查,如發(fā)現(xiàn)制造缺陷應(yīng)提交建設(shè)單位、監(jiān)理單位與制造單位研

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論